PLOT 16 Block 1

photo 2 nd of Augost 2010
kitchen to living

kitchen to living

kitchen to living

kitchen to living

kitchen to living

kitchen to living

kitchen to living

kitchen to living
photo 2 nd of Augost 2010
kitchen to living

kitchen to living

kitchen ( can be extended)

small window in living

Veranda (under construction) is ordered separate and later
At some point some doors are down because of cementing veranda (under construction)
Veranda (under construction) will receive finishing with piso anticua and colonial tile covered massive wooden roof
front

suite 2

back of MS

back of MS

go back

older 1